FILE PHOTO: Exterior of Tesla Gigafactory Texas Building 1 near Austin, Texas (June 17, 2022) — used to illustrate Tesla’s September 29, 2026 SEC credit-facility filing; not a loan-draw or Cybercab production still

Tesla Opens $30B Borrowing Capacity; 8-K Names No Cybercab or Optimus

Tesla locked in $30 billion of new senior unsecured credit capacity on September 29, 2026 — and, on the same day, told the SEC it had borrowed none of it. That is the core of Tesla’s Form 8-K for the September 29 event. The filing describes a right to borrow across three facilities totaling $30 […]